Skip to main content
Skip to main content
Back to BlogBusiness

How to Quote a Bathroom Refit (With Example Pricing)

Step-by-step guide to pricing a bathroom refit in the UK. Covers labour, materials, contingency, and how to present your quote professionally.

The Muster Team
Business Advice
Feb 20, 2026
11 min read

Quoting a bathroom refit is one of the most common — and most nerve-wracking — tasks for UK plumbers and builders. Get it right, and you win work at a healthy margin. Get it wrong, and you're either doing the job for free or losing it to a competitor.

This guide walks you through exactly how to build a bathroom refit quote, with real pricing examples for 2026.

Step 1: Site Survey

Never quote a bathroom without seeing it first. A 30-minute site survey saves you from nasty surprises. Check for:

  • Access: Can you get a bath up the stairs? Will you need to remove doors?
  • Existing plumbing: Copper, plastic, or lead? Where are the soil pipes?
  • Electrics: Location of existing circuits. Will you need a Part P electrician?
  • Ventilation: Existing extractor fan? Window? Building regs require adequate ventilation.
  • Damp or rot: Check under the bath and behind tiles. Factor in remedial work.
  • Asbestos: Properties built before 2000 may have asbestos in tiles, adhesive, or pipe lagging.

Step 2: Scope of Work

Break the job into clear phases and list exactly what's included:

1. Strip out existing suite, tiles, and fittings

2. Plumbing first fix — hot/cold supplies, waste runs

3. Electrical first fix — extractor fan, lighting, shaver socket

4. Tanking/waterproofing wet areas

5. Install bath/shower tray

6. Wall and floor tiling

7. Plumbing second fix — sanitaryware, taps, shower

8. Electrical second fix — fan, lights, heated towel rail

9. Silicone, grouting, snagging

Step 3: Example Pricing (2026)

Here's a realistic breakdown for a standard bathroom refit in the South West of England:

ItemCost
Strip out and waste removal£400–£600
Plumbing first fix£600–£900
Plumbing second fix£400–£600
Electrical work (Part P)£300–£500
Tiling (walls and floor)£800–£1,200
Tanking/waterproofing£200–£350
Bathroom suite (supply)£800–£2,000
Sundries and materials£300–£500
**Total****£3,800–£6,650**

London and the South East: add 20–30%. North and Midlands: reduce by 10–15%.

Step 4: Add Contingency

Always add 10–15% contingency for hidden problems — rotten joists, lead pipes, asbestos. State this on your quote: "Quote is based on current visible conditions. If additional work is required, we will discuss with you before proceeding."

Step 5: Present Professionally

Your quote should include: itemised costs, scope of work, what's excluded (redecoration, flooring outside bathroom), estimated timeline, payment terms, and validity period. Use our free quote template generator to create a professional PDF.

Step 6: Follow Up

Most customers get 3 quotes. The contractor who follows up within 48 hours — with a friendly call, not a pushy message — wins significantly more work. If you use Muster, quote follow-ups are automated.

Last updated: Feb 20, 2026 · Written by The Muster Team

The Muster Team
Business Advice

Writing about business strategy, technology, and best practices for contractors and tradespeople.

Ready to streamline your business?

See how Muster helps trade crews save time on admin and get paid faster.

Free 30-minute walkthrough tailored to your trade